Work day starts at 7:00 am until 3:30 pm. We will meet at the Main Clubhouse. As with all work days, if you want to bring your own specialized tools, you are welcome too. The planned worked includes the following jobs, weather and size of work crew dependent:
- Seal gap at roof line between back lean-to shed and maintenance garage.
- Repair flag pole at Pistol range.
- Build lean-to on Black Powder Lodge for firewood storage.
- Concrete repair of safety wall at back end of the archery range.
- Clearing brush along parking lot behind Archery and on top lot.
- Staining the wood landing on the stairs going to the upper parking lot.
- Staining benches and tables at the Black Powder Range.
- Drain rock from the two safety walls on the main range.
- Build Safety wall for Black Powder Primitive Range.
Also, there will be a variety of small jobs throughout the day.
Any questions, please contact Brad Mueller – Range Construction Lead