General Work Day May 1, 2021
Work day starts at 7:00 am until 3;30 pm. We will meet at the Main Clubhouse. As with all work days, if you want to bring your own specialized tools, you are welcome too. Planned work includes: Install two new LED Parking Lot lights. Scrape / brush main Archery Tower and tables and stain. Repair Archery Walk Through Tower railings. Power wash Archery Walk Through Tower. Repair Archery Walk Through 3D targets (steel rods holding targets in ground) and back stops. Replace table tops on Defense Range (Qty 5) with 5/4 lumber. Build two new paper target holders for Defense Range. Repair front BRC Welcome Sign near Gate B. Empty trash from trash cans on entire range (including back range). Cut 2 X 4 X 8 ft studs for two new outhouses. Also, there will be a variety of small jobs throughout the day.”
Thanks.
Brad Mueller – Range Construction Director